Material Costs, Installation Costs and Operating Costs.
|
|
All too often it happens. You dont get the full story because your Heat Trace supplier doesnt tell
you, or listen, or see your real needs.
|
 |
When that happens you pay the price, in higher material costs or installation costs or operating costs.
Or all three. Nelson engineers look, listen and give you the full story. So you dont get
unnecessary over-specified materials or under-speced problem- prone systems. |
|
But you do get fewer installation hours and greater operating efficiency. For example, the use of Mineral Insulated (MI)
heaters on high temperature steam line freeze protection can eliminate the
need to sandwich two layers of thermal insulation (if polymer heaters are
used). This reduces the total installed costs by 30%. Its a win-win-win proposition.
|
|